TR Lot 4148 GRAND ST. CROIX 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

We are getting close to the pre-drywall walk though with our new home owners!  The electrical wires have been pulled though the majority of the home and are awaiting final installation into their boxes.  The air conditioning system has been completed as well.  The ducts are in and all vents and returns are set!   […]

TR Lot 4124 BARBADOS 2700 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

Our big Barbados on lot 4124 is moving right along.  Tile packages in the bathrooms are complete and the sliding glass doors have just been installed! Take a look at the standard triple aquarium window in the breakfast nook.  The last panel of glass on the right has yet to be installed.  See the difference?  […]

TR Lot 4120 ARUBA 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

We are getting close by the day to this home being completed!  The trim details are being finished, cabinets are in and we are finishing up the bathrooms!  Take a look at the garage space… Yes… it is over 50ft long!  Check back next week to see the continuation of this build!  

TR Lot 4066 GRAND ST. CROIX 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

This is a custom Grand St Croix.  The client has added a 3 car courtyard garage offset to the outside of the home, a custom front elevation and design to the home, has offset the den to the outside and has reconfigured the standard garage!  They have truly used the customization that Medallion Home offers […]

TR Lot 4024 BARBADOS 2400 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

This is going to be a gorgeous home!  Not only is it situated on a lot with complete privacy out the back, but the pool area opens up to overlook a lake surrounded by preserve!  The privacy, and beautiful views, make this a very special home site.   The views are not all that this […]

TR Lot 4143 GRAND ST. CROIX 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

Now that the walls have been painted it is time to move on to the installation of the cabinets and the tile.  The craftsman are in the home currently setting the tile and grout in the photos.  In the next photos the tile will be covered up with paper to protect it and we will […]

TR Lot 4004 ARUBA 10-28-12

by Alex Beasley
OLYMPUS DIGITAL CAMERA

  The footers and the stem wall have just been completed on this home.  The plumbing that goes under the slab has been installed and we are waiting on 1st inspection from the county before we pour the foundation!